Holmes Family Rescue Season 2
Episode 2: Water Finds A Way
Homeowners Joanne and Mike’s plans for an addition to their city home ended in a $500,000 disaster of code violations, costly shortcuts, and endless safety hazards. Mike Holmes called it one of the 10 worst renovations he has ever seen.
Our Valued Contributors
HUGE thanks to Leisure Pools for installing this beautiful pool.
Matt’s Landscaping was awesome to work with!
Philips Lighting provided us with the gorgeous smart outdoor lighting.
Beautiful outdoor kitchen by NewAge Products Inc.
Make Space self-storage lockers and portable moving containers.
Every bathroom renovation project needs to be waterproofed properly. We trust Schluter Systems to Make It Right.
Also Featured:
- Tahoe SlipFence
- Extreme Painting
- Interior Nuovo Inc.
Also Featured:
- PTR Carpentry
- Canadian Door Doctor
Also Featured:
- Trimbo Windows and Doors
- Better Contracting
Also Seen on Holmes Family Rescue
- Extreme Painting
- Interior Nuovo Inc.
- PTR Carpentry inc
- Better Disposal Bins
- Ramboard – ICON Protection
Check Out Other Episodes Of Holmes Family Rescue Season 2
Episode 3: Ungrounded
Homeowners Kim and Sandor thought they checked all the boxes on their wish list when they bought their bungalow, but a year of endless leaks, shocking electrical issues, and a dismissive construction team left them feeling defeated and overwhelmed. Mike, Michael, and Sherry step in to help, but must deal with insufficient waterproofing and dangerous wiring.
Episode 4: Additional Stress
Things got crowded for homeowners Jason and Alison and their young sons, so a two-story addition plus extra basement space was the plan. Unfortunately, the contractor took on more than he could handle and abandoned the project, leaving this financially drained couple with an unfinished, dangerous mess. Mike, Michael, and Sherry must now contend with the triple threat of plumbing, electrical, and HVAC issues.
Episode 5: Steam Dream
Homeowners Alison and Jason were left reeling and financially drained when their contractor abandoned their basement addition project, leaving them with a hazardous home. Mike, Sherry, and Michael stepped up to fix the electrical and HVAC issues, but now must contend with unmovable bulkheads, unsightly posts, and a very bumpy floor.
Related Content
The Flood House
Behind the scenes photos from The Flood House